Case Study: Scaffolding
Multi-Story Commercial Build.
Tulsa, OK
The Challenge
A general contractor needed a safe, reliable exterior perimeter scaffold that could be raised quickly as the building was erected, allowing masons and framers to work simultaneously.
Our Solution
We deployed a comprehensive frame scaffold system with integrated pedestrian canopies to protect workers below and ensure compliance with local city codes.
The Results
The progressive build strategy kept all trades working on schedule, contributing to the project finishing on time and within budget.